Arditi, D., P. Sikangwan, et al. (2002). "Scheduling system for high rise building construction." Construction Management and Economics 20: 353-364.
Arditi, D., O. Tokdemir, et al. (2002). "Challenges in Line-of-Balance Scheduling." Journal of Construction and Engineering Management 128(6): 545-556.
Harris, R. B. and P. G. Ioannou (1998). Repetitive Scheduling Method. UMCEE Report No.98-35. Ann Arbor, University of Michigan.
Lumsden, P. (1968). The line-of-balance method. Oxford, Pergamon Press.
Mendes, R., L. Fernando, et al. (1998). Replanning Method for Multi-Story Building Construction using Line of Balance. International Group of Lean Construction Conference.
Currently I am writing a teaching case study which describes a real case where application of LOB has been proved to be beneficial. The case study is in review and will soon appear in ECCH case study collections. visit http://www.ecch.com/
Unfortunatly the most well known project management softwares like MS Project and Primavera do not provide any feature to develop LOB plans. The most well developted software for LOB in my appinion is Dynaproject from Graphisoft. Visit www.dss.fi